Honolulu Museum of Art

Honolulu, Hawaii

Client: Honolulu Museum of Art
Project Duration: August 2024 – October 2024

Project Manager: Jason Simms
Contractor: Pono Construction Group, Kapili Roofing

Scope & Systems

  • Removal: Aged asphaltic sheet-applied waterproofing
  • Replacement: 20-Year liquid-applied system beneath pedestal and paver assembly
  • AVM Systems Used:
    • AVM Epoxy Primer 401
    • AVM Aussie Membrane 520 PRO
    • AVM System 620

Construction Process Overview

  • Crack chasing and surface preparation
  • Extensive concrete repairs
  • Structural reinforcement
  • Primer + membrane + traffic coating system application

Challenges & Solutions

  • Severely deteriorated deck conditions
  • Multiple contractors/manufacturers declined the project
  • AVM’s field team and contractor partnership overcame structural issues using expert repair techniques and proven products

Results

  • Successful restoration of one of the most structurally demanding decks encountered
  • Installed a durable, high-performance waterproofing and traffic-bearing system

Design Integration

  • Design goal: Preserve structural deck integrity while maintaining the original architectural paver layout
  • Liquid-applied AVM systems allowed seamless reinstallation of pedestal and paver assemblies

System Selections & Benefits

System Purpose Design Benefit
AVM Epoxy Primer 401 Substrate Conditioning Optimal adhesion under repair conditions
AVM Aussie Membrane 520 Flexible Waterproofing Membrane Liquid detailing around complex penetrations
AVM System 620 Traffic-Grade Waterproofing Long-term durability beneath pavers

Technical Collaboration

  • Engineers and installers collaborated closely to adapt detailing to onsite structural surprises
  • AVM technical team provided onsite guidance and product sequencing plans

Outcome

  • Structure rehabilitated without altering surface design
  • 20-Year warranted protection with AVM products
  • Aesthetic and functional integrity retained

Project Objective

To remove the aging, failed sheet-applied asphaltic waterproofing and replace it with a 20-Year liquid-applied waterproofing system beneath the existing pedestal and paver assembly.

Owner Goals

  • Long-term deck protection
  • Avoid disruption to museum operations
  • Quick turnaround and allow the deck to be turned over within just 12 hours!

Key Challenges

  • Structural damage and cracking
  • Concrete deterioration
  • Few vendors willing to take on the complexity

AVM Solutions Delivered

  • AVM Epoxy Primer 401: Enhanced adhesion on compromised substrate
  • AVM Aussie Membrane 520 PRO: Liquid membrane for adaptable, seamless coverage
  • AVM System 620 Vehicular: High-durability coating for traffic-bearing surfaces

Value Delivered

  • A reliable, warrantied waterproofing system
  • Extended building life span
  • Peace of mind from using field-proven AVM technology
gallery of AVM System 620 being applied to Honolulu Museum of Art's front entrance

Sign-up For Our Newsletter

Get the latest news, product information and up-to-date industry information.

Please fill in your full name

This field is required

Your email address will never be used for evil

This field is required

This field is required

You may unsubscribe at any time.